R e f e r e n c e s: 4- and 6-lane highways
| Highway-new-constuction Highway-completion |
Scope of work | Construction Cost [Mio €] | Fee [T €] |
Employer | Executed |
BAB A 14 Halle - Magdeburg |
- Preliminary design |
212,0 |
2.093 |
DEGES Mr. Woitzel |
1991 - 1997 |
A 20 Rostock - national border MV/BB |
- Preliminary design |
2.500,0 |
625 |
DEGES |
1993 |
A 20 Lübeck - Stettin |
- Preliminary design |
58,5 |
187 |
DEGES |
1995 - 1997 |
A 20 Lübeck - Stettin |
- Preliminary design |
38,5 |
240 |
DEGES |
1996 - 1997 |
|
- Preliminary design |
720,0 |
600 |
Land Thüringen |
1992 - 1993 |
A 38 Göttingen - Halle |
- Preliminary design |
76,5 |
600 |
DEGES |
1996 - 1998 |
B 6 n (RQ 26) between A 395 |
- Preliminary design
|
68,5 |
472 |
SBA Halberstadt |
1997 - 2000 |
B 6 n (RQ 26) between A 395
and A 14 |
- Preliminary design |
103,9 |
583 |
SBA Halberstadt |
1997 - 2001 |
B 6 n (RQ 26) between A 395
and A 14 |
- Investigation of variants north- and south-umgehung |
216,0 |
288 |
LAS Halle |
1998 - 1999 |
6-lane Highway-completion |
- Design and official design |
105,0 |
1.817 |
ABA Thüringen |
1994 - 1998 |
B 6 n (RQ 26) between A 395
and A 14 |
- Investigation of variants |
216,0 |
288 |
LAS Halle |
1998 - 1999 |
B 6 n (RQ 26) between A 395
and A 14 |
- Investigation of variants |
216,0 |
288 |
LAS Halle |
1998 - 1999 |
A 66 Frankfurt - Fulda |
- Design surveying |
148,0 |
900 |
SBA Hanau |
1988 - 1992 |
Highway-completion |
- Design surveying |
48,5 |
350 |
ASV Fulda |
1993 - 1997 |
6-lane Highway-completion
|
- Surveying |
59,5 |
1.100 |
NLStB / SNA Northeim
|
1989 - 1995
|
Highway-completion |
- Final design |
42,0 |
600 |
ABA Thüringen |
1995 - 1996 |
6-lane Highway-completion |
- Final design |
65,6 |
560 |
DEGES |
1996 - 1997 |
6-lane Highway-completion |
- Final design |
15,5 |
600 |
ABA Thüringen |
1992 - 1996 |
6-lane Highway-completion |
- Surveying |
73,5 |
900 |
NLStB Hannover |
1992 - 1997 |
A 71 Erfurt - Schweinfurt
|
- Final design |
60,0 |
700 |
DEGES |
1996 - 1998 |
| A 20 Lübeck - Stettin section: Grevensmühlen to Wismar east VKE 2813 and 2814 |
- Preparation of tender documents - Supervision |
181,5 | 1.800 | DEGES Mr. Droste |
1995 - 1998 |
| A 20 Lübeck - Stettin section: Wismar east to Neukloster VKE 2815 |
- Preparation of tender documents - Contracting - Supervision |
105 | 2.250 | DEGES Mr. Winkler |
1997 - 2002 |
| 6-lane Highway-completion BAB A 4 Eisenach - Dresden section: interchange Erfurt east to filling and recreation area Eichelborn km 202,8 to km 210,5 |
- Preparation of tender documents - Time schedule for construction periods - Contracting - Supervision |
38 | 1.225 | ABA Thüringen Mr. Ruhl |
1997 - 2002 |
| A 20 Nord-West-Umfahrung Hamburg including Elbquerung section: A 21 west Bad Segeberg (SH) to A 26 by Stade (NI) (4 main variants, middle length: each 94,7 km) |
- Preliminary design - Investigation of different alternation by vertical and horizontal alignment |
929 | 550 | MWTV Schleswig-Holstein Projektgruppe A 20 Mr. Schnabel |
1999 - 2002 |
| B 6 n (RQ 26) between A 395 and A 14 planning section 4: B 244 Wernigerode to K 1346 Benzingerode km 17,89 to 25,5 |
- Preparation of tender documents - Supervision |
68,4 | 550 | SBA Halberstadt Mr. Speidel |
2000 - 2002 |
| BAB A 143 Westumfahrung Halle section: Lauchatal to interchange Halle-north VKE 4221.2 |
- Preparation of tender documents - Contracting - Supervision |
88,2 | 900 | DEGES Mr. Pfeffermann |
2001 - 2004 |
| Highway-completion BAB A 1 Hamburg - Bremen section: west interchange Sittensen to eastern filling and recreation area Auetal VAE 3 |
- Preliminary design - Design - Official design - Final design |
44,7 | 600 | SBA Verden Mr. Genent | 2001 - 2004 |
| Highway-completion BAB A 7 Hannover - Kassel section: highway junction Salzgitter to interchange Bockenem VKE 1 |
- Design surveying - Preliminary design - Official design - Final design |
50,5 | 700 | SBA Gandersheim Mr. Conrad |
2001 - 2005 |
| A 281 between A 27 and A 1 |
- Preparation of tender docume - Supervision |
42,5 | 1.150 | GPV Bremen | 2002 - 2006 |
| Replacement ICE-line Hildesheim to Stendal |
- Surveying during construction - Accounts |
42 | 400 | WALTER-HEILIT | 2002 |
| BAB A 38 Göttingen - Halle section: interchange Heringen to highway junction Lauchatal VKE 56.18 and 46.11 |
- Preparation of tender docume - Supervision - Local supervision |
131,5 | 1.350 | DEGES Mr. Pfeffermann |
2003 - 2006 |
| BAB A 38 Göttingen - Halle section: interchange Bleicherode to Wipperdorf |
- Preparation of tender docume - Supervision - Local supervision |
42,6 | 750 | DEGES Mr. Labusga |
2002 - 2005 |