R e f e r e n c e s:  4- and 6-lane highways

Highway-new-constuction
Highway-completion
Scope of work Construction Cost  [Mio €] Fee
[T €]
Employer Executed
German Site

BAB A 14 Halle - Magdeburg
B 71 - interchange Magdeburg - B 246 a
VKE 4111, 4112, 4113; altogether 26,5 km,
interchange A 14 / A 2 and 5 interchanges

- Preliminary design
- Design and official design
- Final design
- Time schedule for   construction  periods

212,0

2.093

DEGES

Mr. Woitzel

1991 - 1997

A 20 Rostock - national border MV/BB
section: west Grimmen to B 96 (Jarmen)
with Stralsund / Rügen-Anbindung about 300 km variants

- Preliminary design
- Investigation of different alternation by vertical and   horizontal alignment

2.500,0

625

DEGES
Mr. Winkler

1993

A 20 Lübeck - Stettin
section : interchange Gützkow to interchange
Jarmen
VKE 2836

- Preliminary design
- Design and official   design
- Final design

58,5

187

DEGES
Mrs. Langowski

1995 - 1997

A 20 Lübeck - Stettin
section : interchange Dersekow to interchange Gützkow
VKE 2826

- Preliminary design
- Design and official   design
- Final design

38,5

240

DEGES
Mr. Reuter

1996 - 1997


A 71 / A 81
section : Armstadt to Sömmerda about 80 km variants

- Preliminary design
- Investigation of   different   alternation   by vertical and   horizontal alignment

720,0

600

Land Thüringen
Mr. von der Osten

1992 - 1993

A 38 Göttingen - Halle
section : interchange Leinefelde to interchange Breitenworbis filling and recreation area Eichsfeld
VKE 5613

- Preliminary design
- Design and official   design
- Final design
- Preparation of tender   documents

76,5

600

DEGES
Mr. Rothe

1996 - 1998

B 6 n (RQ 26) between A 395
und A 14

planning section 4:
B 244 Wernigerode to K 1346 Benzingerode km 17,89 to 25,5

- Preliminary design
- Design and official design
- Final design
- Preparation of tender   documents

 

68,5

472

SBA Halberstadt
Mr. Kretschmer

1997 - 2000

B 6 n (RQ 26) between A 395 and A 14
planning section 5 to 7:
K 1346 Benzingerode to interchange Blankenburg Ost km 25,5 to 36,7

- Preliminary design
- Design and official   design
- Final design
- Preparation of tender   documents

103,9

583

SBA Halberstadt
Mr. Kretschmer

1997 - 2001

B 6 n (RQ 26) between A 395 and A 14
section : Quedlinburg (simple planning length 27 km)

- Investigation of   variants  north- and   south-umgehung
- Preliminary design
- Investigation of   different   alternation by   vertical and   horizontal alignment

216,0

288

LAS Halle
Mr. Kaufmann

1998 - 1999

6-lane Highway-completion
A 4 Eisenach - Dresden
section: interchange Arnstadt to Eichelborn
km 223,875 to km 202,830 filling and recreation area Eichelborn

- Design and official design
- Final design
- Time schedule for construction   periods
- Preparation of tender   documents

105,0

1.817

ABA Thüringen
Mr. Ruhl / Mr. Matz

1994 - 1998

B 6 n (RQ 26) between A 395 and A 14
section : Quedlinburg (simple planning length 27 km)

- Investigation of variants
  north- and south-umgehung
- Preliminary design
- Investigation of different   alternation by vertical and   horizontal alignment

216,0

288

LAS Halle
Mr. Kaufmann

1998 - 1999

B 6 n (RQ 26) between A 395 and A 14
section : Quedlinburg (simple planning length 27 km)

- Investigation of variants
  north- and south-umgehung
- Preliminary design
- Investigation of different   alternation by vertical and   horizontal alignment

216,0

288

LAS Halle
Mr. Kaufmann

1998 - 1999

A 66 Frankfurt - Fulda
section : Ahl to Schlütern (18,5 km)

- Design surveying
- Design and official design
- Final design
- Preparation of tender   documents

148,0

900

SBA Hanau
Mr. Sauerbrunn

1988 - 1992

Highway-completion
A 66 Frankfurt - Fulda
section: B 27 to highway junction A 7

- Design surveying
- Design and official design
- Final design

48,5

350

ASV Fulda
Mr. Lehmkuhl

1993 - 1997

6-lane Highway-completion
A 7 Hannover - Kassel
sections : km 172,0 to km 181,0 km 256,0 to km 268,0

 

- Surveying
- Design and official design
- Final design
- Time schedule for construction   periods

59,5

1.100

NLStB / SNA Northeim
Mr. Conrad

 

 

1989 - 1995
1999 - 2000

 

 

Highway-completion
A 9 Berlin - Hof
section : Eisenberg to Bad Klosterlauswitz

- Final design
- Supervision
- Documentation

42,0

600

ABA Thüringen
Mr. Ruhl

1995 - 1996

6-lane Highway-completion
A 2 Hannover - Berlin
section : interchange Magdeburg to interchange Bornstedt
km 96,430 - km 109,800
VKE 4711 - 4713

- Final design
- Time schedule for construction   periods
- Preparation of tender   documents
- Contracting

65,6

560

DEGES
Mr. Dr. Pasderski

1996 - 1997

6-lane Highway-completion
BAB A 4 / A 9
interchange "Hermsdorfer Kreuz"

- Final design
- Time schedule for construction   periods
- Preparation of tender   documents
- Supervision
- Documentation

15,5

600

ABA Thüringen
Mr. Ruhl

1992 - 1996

6-lane Highway-completion
A 2 Hannover - Dortmund
section : interchange Nenndorf to interchange Rehren
km 252,990 - km 267,997

- Surveying
- Design and official design
- Final design
- Time schedule for construction   periods
- Preparation of tender   documents

73,5

900

NLStB Hannover
Mr. Schwägermann

1992 - 1997

A 71 Erfurt - Schweinfurt
section : interchange Erfurt to interchange B 7
VKE 5335

 

- Final design
- Time schedule for construction   periods
- Preparation of tender documents
- Contracting
- Supervision

60,0

700

DEGES
Mr. Deß

1996 - 1998

A 20 Lübeck - Stettin
section: Grevensmühlen to Wismar east   VKE 2813 and 2814  
- Preparation of tender    documents
- Supervision
181,5 1.800 DEGES
Mr. Droste  
1995 - 1998
A 20 Lübeck - Stettin
section: Wismar east to Neukloster
VKE 2815  
- Preparation of tender documents
- Contracting
- Supervision
105 2.250   DEGES
  Mr. Winkler
1997 - 2002
6-lane Highway-completion
BAB A 4 Eisenach - Dresden
section: interchange Erfurt east to filling and recreation area Eichelborn
km 202,8 to km 210,5
- Preparation of tender   documents
- Time schedule for construction   periods
- Contracting
- Supervision
38 1.225   ABA Thüringen
  Mr. Ruhl
1997 - 2002
A 20 Nord-West-Umfahrung Hamburg
including Elbquerung
section: A 21 west Bad Segeberg (SH) to   A 26 by Stade (NI)
(4 main variants, middle length: each 94,7 km)
- Preliminary design
- Investigation of different   alternation  by vertical and   horizontal alignment
929 550 MWTV Schleswig-Holstein
Projektgruppe A 20
  Mr. Schnabel
1999 - 2002
B 6 n (RQ 26)   between A 395 and A 14
planning section 4:    B 244 Wernigerode to K 1346 Benzingerode
km 17,89 to 25,5  
- Preparation of tender   documents
- Supervision
68,4 550   SBA Halberstadt
  Mr. Speidel
2000 - 2002
BAB A 143 Westumfahrung Halle
section: Lauchatal to interchange Halle-north
  VKE 4221.2
  - Preparation of tender    documents
  - Contracting
  - Supervision  
88,2 900   DEGES
  Mr. Pfeffermann
 2001 - 2004
Highway-completion
BAB A 1 Hamburg - Bremen
section: west interchange Sittensen to eastern filling and recreation area Auetal
VAE 3
- Preliminary design
- Design
- Official design
- Final design
44,7 600 SBA Verden Mr. Genent 2001 - 2004
Highway-completion
BAB A 7 Hannover - Kassel
section: highway junction Salzgitter to interchange Bockenem
VKE 1
- Design surveying
- Preliminary design
- Official design
- Final design
50,5 700 SBA Gandersheim
Mr. Conrad
2001 - 2005

A 281 between A 27 and A 1
- Preparation of tender   docume
- Supervision
42,5 1.150 GPV Bremen 2002 - 2006
Replacement ICE-line
Hildesheim to Stendal
- Surveying during construction
- Accounts
42 400 WALTER-HEILIT 2002
BAB A 38 Göttingen - Halle
section: interchange Heringen to highway junction Lauchatal
VKE 56.18 and 46.11
- Preparation of tender docume
- Supervision
- Local supervision
131,5 1.350 DEGES
Mr. Pfeffermann
2003 - 2006
BAB A 38 Göttingen - Halle
section: interchange Bleicherode to Wipperdorf
- Preparation of tender   docume
- Supervision
- Local supervision
42,6 750 DEGES
Mr. Labusga
2002 - 2005